Please follow the steps below to configure parallel settings
:
Step 1: Make sure power cables and parallel comms cables have been wired correctly and make sure the DIP
configurations are correct.
Step 2: Power on inverters and set inverters to standby (set standby via Basic page)
Step 3: Set Grid type to “208V/120V” and correct grid regulation option, ensure the same configurations to both two invert-
ers
Step 4: Set the host inverter to “3 phase Master” and “phase U”, and set slave inverter to “Slave” and “phase W”.
Step 5: Set “Share battery” enable on both inverters