EasyManua.ls Logo

EMC-PARTNER TRA3000 S - Page 86

EMC-PARTNER TRA3000 S
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRANSIENT3000
86/162
6.2.3.4 DIPS
loaded test EUT power v, i
possible ramps at DIP
Example Level Ramp: Amplitude as % of EUT voltage
loaded test EUT power v, i
Level ramp at DIP
-400
-300
-200
-100
0
100
200
300
400
6.2.3.4.1 Definition DIP level ramp
The start of the ramp begins at 100% and changes with „Level step“ (10%) to the DIP voltage. If the test
time has been selected to be long enough, the voltage UT will be reached.
Ramp: Length of interruption in ms:
loaded test EUT power v, i
Duration ramp at DIP
1 dip
Level step

Table of Contents

Related product manuals