Condensate pump
Maintenance task Maintenance interval
Check for leaks 3 months
Replace porous pump hose as required, but no later than after 12
months
Phosphoric acid pump
Maintenance task Maintenance interval
Check for leaks 3 months
Replace porous pump hose as required, but no later than after 12
months
Syringe
Maintenance task Maintenance interval
Check for leaks 3 months
Clean syringe as required, but no later than after 12
months
Locks
Maintenance task Maintenance interval
Check for leaks 3 months
Replace the septum of the TC lock as required, but no later than after 12
months
ChD (optional)
Maintenance task Maintenance interval
Replace the support battery 12 months
NOTICE
To carry out regular inspections and maintenance tasks always ensure that the doors
and the left side wall of the analyzer are freely accessible.
NOTICE
Ensure that all connections are
gas-tight again after servicing:
Do not insert the Fingertight screw connections twisted!
Tighten all screw connections finger-tight!
Check the system for leaks (see section "
Checking the system for tightness" p. 89).
NOTICE
Tighten the Allen screws using the corresponding angular Allen key supplied. Tighten all
other screw connections only finger
-tight without the use of tools.