multi N/C 2100S Maintenance and care
81
11. Unscrew the Peltier cooling block on the
side with 4 screws from the insertion
tray for the TIC container.
Take the TIC condensate container out
of the tray and pour the contents into a
beaker.
13. Check the TIC condensate container and condensation coil for deposits and cracks.
14.
If required, flush both containers coil with ultrapure water and leave to dry
completely.
7.7.2 Installing the TIC condensate container and condensation coil
1. Slide the rubber ring onto the lower
connection of the condensate container.
It protects the glass container when it
rests on the metal holder of the support
plate.
2. Place the condensate container in the tray
of the carrier plate.
Screw the Peltier cooling block on the side
with 4 screws to the tray.