EasyManua.ls Logo

Endress+Hauser Analytik Jena multi N/C 2100S - Page 82

Endress+Hauser Analytik Jena multi N/C 2100S
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and care multi N/C 2100S
82
4. Press the condensation coil into the
clamps on the carrier plate (arrow.
5.
Connect the following hoses:
Hose no. 1 connects the TIC
condensate container to the cooling
coil
Hose no. 16 to the condensate pump
Hose no. 21 to the phosphoric acid
pump (this hose must protrude into
the TIC condensate container)
Note:
The FAST connector and hose no. 6 must be
pushed at least 1 cm onto the glass port of
the TIC condensate container.
6. Hang the carrier plate into the mount on
the right-hand side of the furnace.
The spherical joint of the condensation
coil will reach into the cut-out of the
combustion furnace.
7.
Connect the Peltier cooling block at the
backplate (see arrow).
8. Connect hose no. 2 (to the water traps) to
the top outlet of the TIC condensate
container.

Table of Contents

Related product manuals