EasyManua.ls Logo

Epson C8-B - Page 319

Epson C8-B
455 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C8-B/C12-B Service Manual Maintenance Disclosure Scope: Maintenance Trained Personnel Only
(C) Seiko Epson Corporation 2-277 Rev.1
4. Fully tighten the cable bracket (C2) fixing screws.
POINT
Check that the silicone tube has not come off from the cable bracket (C2).
5. Connect the Ground Wires (PE5, PE6, FB11) to Arm1.
S04: 3-M4x6
(0.9 +/- 0.1 N·m)
A
Arm1
FB11
PE5
PE6
S01: 2-M3x6
(2.4 +/- 0.1 N·m)
A
Cable bracket (C2)
Silicone tube
Installing the Cable Unit

Table of Contents

Related product manuals