EasyManua.ls Logo

Epson C8-B - General Maintenance; Schedule for Maintenance Inspection

Epson C8-B
455 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C8-B/C12-B Service Manual Maintenance Information Disclosure Scope: Maintenance Trained Personnel Only
(C) Seiko Epson Corporation 1-3 Rev.1
1.2 General Maintenance
Performing maintenance inspections properly is essential for preventing trouble and maintaining safety. This chapter describes the
schedules for maintenance inspection and procedures.
Be sure to perform the maintenance inspections in accordance with the schedule.
1.2.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must be added every 250 hours, 750 hours, 1,500
hours, and 3,000 hours operation.
Inspection Point
Daily inspection
Monthly
inspection
Quarterly
inspection
Biannual
inspection
Annual
inspection
Overhaul
(replacement)
1 month (250 h)
Inspect every day
-
-
-
-
2 months (500 h)
-
-
-
-
3 months (750 h)
-
-
-
4 months (1,000 h)
-
-
-
-
5 months (1,250 h)
-
-
-
-
6 months (1,500 h)
-
-
7 months (1,750 h)
-
-
-
-
8 months (2,000 h)
-
-
-
-
9 months (2,250 h)
-
-
-
10 months (2,500 h)
-
-
-
-
11 months (2,750 h)
-
-
-
-
12 months (3,000 h)
-
13 months (3,250 h)
-
-
-
-
20,000 h
-
-
-
-
-

Table of Contents

Related product manuals