EasyManua.ls Logo

Fike Clean Agent System - Page 7

Fike Clean Agent System
140 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
Manual P/N: 06-215 (Rev G)
2.6 CONTAINER SELECTION..........................................................................................................................11
2.6.1 Container Size and Fill Range.....................................................................................................................11
2.6.2 Container Location(s) ..................................................................................................................................12
2.6.3 Storage Temperature Limitations................................................................................................................12
2.7 NOZZLE SELECTION.................................................................................................................................13
2.7.1 System Type................................................................................................................................................13
2.7.2 Nozzle Flow Rates.......................................................................................................................................13
2.7.2.1 Engineered Nozzles..............................................................................................................................14
2.7.3 Nozzle Area Coverage ................................................................................................................................14
2.7.4 Nozzle Placement........................................................................................................................................15
2.7.4.1 Ceiling Heights Greater Than 16'-0" (4.9 m).........................................................................................16
2.7.5 Nozzle Discharge Obstructions...................................................................................................................17
2.8 PIPING NETWORK LIMITATIONS (ENGINEERED SYSTEMS)...............................................................18
2.8.1 Tee Split Ratios ...........................................................................................................................................18
2.8.1.1 Bullhead Tee.........................................................................................................................................18
2.8.1.2 Side-Thru Tee .......................................................................................................................................18
2.8.2 Maximum Elevation Differences in Pipe Runs ...........................................................................................19
2.8.3 Tee Orientation............................................................................................................................................20
2.8.4 Estimating Pipe Size (Engineered Systems)...............................................................................................21
2.8.4.1 Discharge Duration ...............................................................................................................................21
2.8.4.2 Minimum Flow Rates ............................................................................................................................21
2.8.5 Minimum Piping Distance (Engineering Systems) ......................................................................................22
2.8.5.1 Distance from a Tee to an Elbow or Tee ..............................................................................................22
2.8.5.2 Distance from an Elbow to a Tee..........................................................................................................22
2.8.6 Equivalent Length Values............................................................................................................................23
2.9 ENGINEERED SYSTEM DESIGN LIMITS .................................................................................................24
2.9.1 Percent of Agent In Pipe..............................................................................................................................24
2.9.2 Location of First Tee....................................................................................................................................24
2.9.3 Liquid Arrival Time.......................................................................................................................................25
2.9.4 Liquid Runout Time .....................................................................................................................................25
2.10 MANIFOLD OPTIONS (ENGINEERED SYSTEMS)...................................................................................26
2.11 PER-ENGINEERED SYSTEMS DESIGN...................................................................................................29
2.11.1 Piping Layout...............................................................................................................................................29
2.11.2 Determining Pipe Sizes ...............................................................................................................................29
2.11.2.1 Single Nozzle Piping Table – 35 lb. thru 215 lb. Containers ................................................................30
2.11.2.2 Two Nozzle Piping Table – 60 lb. thru 375 lb. Containers....................................................................31
2.11.2.3 Four Nozzle Piping Table – 60 lb. thru 375 lb. Containers...................................................................32

Table of Contents