EasyManua.ls Logo

Fujitsu ETERNUS CS800 S6 - Page 263

Fujitsu ETERNUS CS800 S6
561 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.7 Scheduler
Figure 182: Scheduler Page
Tasks
Use the Scheduler page to perform the following tasks:
l View currently scheduled events (see "Viewing Scheduled Events" on page 263).
l Add a new scheduled event or edit an existing event (see "Adding or Editing a
Scheduled Event" on page 264).
l Configure NAS shares or VTL partitions for scheduled replication (see "Scheduling a
Share or Partition for Replication" on page 266).
l Configure replication throttle events (see "Scheduling Replication Throttling" on page
266).
l Configure the ETERNUS CS800 to send status and configuration reports (see
"Scheduling E-mail Reports" on page 268).
l Configure the ETERNUS CS800 to run healthchecks (see "Scheduling Healthchecks" on
page 268).
l Configure the ETERNUS CS800 to run space reclamation (see "Scheduling Space
Reclamation" on page 269).
l Specify when and how often an event reoccurs (see "Setting Recurrence for a Scheduled
Event" on page 269).
l Remove an event occurrence or event series from the schedule (see "Deleting a
Scheduled Event" on page 270).
Viewing Scheduled Events
The Scheduler page displays all replication, replication throttle, e-mail report,
healthchecks, and space reclamation events scheduled to occur in a selected time period.
ETERNUS CS800 263

Table of Contents

Other manuals for Fujitsu ETERNUS CS800 S6

Related product manuals