EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - Page 264

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
ETSI Configuration
Installing Fans, Rack Covers, and End Panels
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-46
Fujitsu and Fujitsu Customer Use Only
4 Position the keyholes in the lower ETSI cover panel over the hook of the upper two standoffs.
Let the panel drop down into the slot formed by the hook. Secure the panel in place by
tightening the two lower captive panel screws using the Hex Torx pin tool provided by the
ETSI Rack Cover Kit. See Figure 4-28 [p. 4-46].
Figure 4-28: Lower Cover Panel Installation Details
r1420_1
See detail A.
Detail A
Hook keyhole feature over hook
on upper standoff (2 places).
Secure panel by fastening
captive screw on panel
to pin/socket standoff
using supplied special tool
(2 places).
Revision 1, June 2009

Table of Contents

Related product manuals