1. OPERATIONAL OVERVIEW
1-11
PV TEST CALL is pending. PV test pending by LES
TEST-RECEIVING MESSAGE Receiving test message from LES
TEST-SENDING MESSAGE Sending test message to LES
TEST-DISTRESS ALERT Sending test distress alert to LES
WAITING FOR ACTIVATION Waiting start of PV test
WAITING FOR TEST RESULT Waiting for results of PV test
CLEARING Clearing PV test
PV TEST is Completed. PV test is completed.
PV TEST Failure. PV test failed.
(4b) RF CON/CPU’s program version number
DCE F15 Ver. XX (XX = Version Number)
Note: Error message is displayed when equipment abnormality is detected.
(5) Frame synchronization
Blank Changing channel, or during transmission
SYNC (NCS) Synchronizing with NCS
SYNC (LES) Synchronizing with LES
MES Sig. Ch Changing MES signaling channel
MES Msg. Ch Changing MES message channel
UNSYNC Out of synchronization
Retuning Synchronizing with NCS or LES
(6) Ocean region receiving
No display Out of synch with satellite
AOR-W Atlantic Ocean Region-West
AOR-E Atlantic Ocean Region-East
IOR Indian Ocean Region
POR Pacific Ocean Region
(7) Logging status
LOGOUT Logged out with ocean region
LOGIN Logged in with ocean region
LOGIN (Flashing) Logging in with ocean region