EasyManua.ls Logo

GE Security ZP3 - Figure 27: Removing the Door and Chassis Assembly; Removing the Door and Chassis Assembly

GE Security ZP3
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ZP3 Fire Control Panel Installation, Commissioning and Maintenance Manual
Page 34 REV 11 (ISS 08/03/2010)
Removing the door and chassis assembly
Refer to Figure 27. Once the panel is unpacked, the door and chassis may be removed as follows:
1. Disconnect the four earth straps to the door (item 1).
2. Disconnect wire and quick release connector (item 2) from the main board.
3. Cut the cable ties and free the cables.
4. Disconnect the SSB ribbon cable (item 3) from the main board.
5. Remove the two screws (item 4) and remove the door.
6. Disconnect power supply plug (item 5).
7. Remove the four nuts (item 6) and remove the chassis.
Figure 27: Removing the door and chassis assembly
Legend
Item Description Item Description
1 Earth strap 4 Securing screw
2 Wire * quick release connector 5 Power supply plug
3 SSB ribbon cable 6 Securing nut

Table of Contents

Related product manuals