Storing the door assembly
The door assembly may be stored until required in the packing carton provided. Re-pack as
shown in Figure 28, making sure that the door hinges are placed in the cut-out provided.
Figure 28: Storing the door assembly
Storing the main chassis
See Figure 29. The main chassis assembly may be stored until required in the packing carton
provided. The chassis should be re-packaged by wrapping in a protective wrap (such as bubble-
wrap), and then placed in the main panel carton.