[EN]  English - K0460 Electrical operations   3-1
Issue 1
Chapter 3: Electrical operations
3.1  Introduction
This section gives examples of how to connect and use the 
instrument for these operations:
• To measure and source electrical values.  
Before starting:
• Read and understand the “Safety” section.
• Do not use a damaged instrument.
Note: Use only original parts supplied by the manufacturer.
3.2  Measure and 
source operations
When using the calibrator for the first time, there are default 
measure  and source   functions on the display; see 
Section 2.8.3.
3.2.1 Procedure overview
To use the calibrator, complete these procedures:
• Set the required calibrator functions on the display:  item 
; see Section 2.8.3. This includes: 
a. CH1: Channel 1 electrical function (measure or source).
b. CH2: Channel 2 electrical function (measure or source).
c. Pressure function (P1 and/or P2): for the MC 620-IS 
module carrier, see Chapter 4; for the PV 62x-IS 
pressure stations (P1 only), refer to user manual - K0462.
d. Other functions (maximum: 6 functions).
• If necessary, change the Units for the function: item  ;
see Section 2.8.5
• If necessary, set a Utility for the function: item  ; see 
Section 2.8.6
a. Max/Min/Avg
b. Switch Test
c. Leak Test (pressure options only)