EasyManua.ls Logo

GE Druck DPI 620-IS - Chapter 10: Calibration procedures; 10.2 Before starting

GE Druck DPI 620-IS
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
[EN] English - K0460 Calibration procedures 10-1
Chapter 10: Calibration procedures
10.1 Introduction
Note: GE can provide a calibration service that is traceable to
international standards.
Return of the instrument to the manufacturer (recommended)
or an approved service agent for calibration.
When using an alternative calibration facility, make sure that it
uses these standards.
10.2 Before starting
To do an accurate calibration:
use the calibration equipment specified in Table 10-1.
calibrate in a stable temperature environment: 21 ± 1°C (70
± 2°F).
Note: Before starting a calibration procedure, leave the
instrument in the calibration environment for a minimum
period of two hours.
Table 10-1: Calibration equipment
Function Calibration equipment
(ppm = parts per million)
Current
(CH1 or CH2)
Current (mA) calibrator.
Accuracy - Current measure/source; see
Table 10-2/10-3.
Voltage
(CH1 or CH2)
Volts calibrator.
Accuracy - Voltage measure/source; see Table 10-5/10-7.
Millivolts
(CH1 or CH2)
OR
TC mV (CH1)
mV calibrator.
Accuracy - Millivolts measure/source; see Table 10-4/10-6.
Accuracy - TC mV; see Table 10-12.
Frequency
(CH1)
(measure) (source)
Signal generator
Total error: 0.3 ppm or better
Frequency meter
Total error: 0.3 ppm or better
Resolution: 8 digits (minimum)
Amplitude (source) Digital voltmeter (DVM)

Table of Contents

Related product manuals