GE MEDICAL SYSTEMS
DIRECTION 2380207, REVISION 7 LOGIQ™ 5 PRO SERVICE MANUAL
8 - 162 Section 8-9 - Power Block
8-9-4-4 Removal Procedure (cont’d)
6.) Unscrew four (4) ground screws (5-8). Refer to Figure 8-180.
7.) Unscrew one nut in the Center top of the Transformer. Refer to Figure 8-181.
8.) Remove the Transformer Assy.
9.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-9-4-5 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-180 Unscrew 4 screws
Figure 8-181 Removing the Transformer
Table 8-52 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2380207, Rev 7+, Section 8-9-4. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-13-18
Transformer function check procedure
Section 4-3-4
System B/M-Mode Checks
Section 4-3-5
System CFM and PWD Checks
(5) (6)
(7) (8)