DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 362 Section 8-11 - Front End Acquisition / Card Cage parts replacement
Preparation Links (if you need more information):
• 4-2-4 "Power SHUT DOWN" on page 4-9.
• 8-6-3 "Side Cover(s)/Side Air Intake (Filter) inspection / replacement" on page 8-33.
• 8-6-4 "Front Cover replacement" on page 8-38.
• 8-6-5 "Foot Rest Bumper replacement" on page 8-41.
• 8-6-6 "Mains Cable Hook replacement" on page 8-43.
• 8-6-7 "Rear Cover/Air Exhaust replacement" on page 8-45.
• 8-6-8 "Rear Bumper/Air Intake (Filter) inspection / replacement" on page 8-49.
• 8-11-3 "Front End Card Cage Cover replacement" on page 8-255.
• 8-11-4 "Front Plane / XD BUS replacement" on page 8-259.
• 8-11-5 "Relay Board (GRLY or RLY) replacement" on page 8-263.
• 8-11-6 "Transmitter Board (ETX) replacement" on page 8-266.
• 8-11-8 "ECB replacement" on page 8-272.
• 8-11-12 "EPM replacement" on page 8-295.
• 8-11-13 "Backplane replacement" on page 8-298.
• 8-11-16 "Batteries replacement" on page 8-330.
• 8-11-17 "HDD replacement" on page 8-335.
• 8-11-18 "Fan Tray replacement" on page 8-339.
• 8-11-19 "Light Block (Hard Drive/Network Status) replacement" on page 8-342.
• 8-11-21 "Cable Holders - ECB, Main Power Supply and Rear I/O replacement" on page 8-348.
• 8-12-2 "MPS replacement" on page 8-369
• 8-13-3 "DVD R/W drive replacement" on page 8-374.
• 8-13-4 "Drive Bay Storage Drawer (DVD Storage) replacement" on page 8-378
• 8-16-5 "CW Option replacement" on page 8-413.
• 8-16-6 "Patient I/O ECG Option replacement" on page 8-417.
• 8-16-8 "Printer (Digital Graphic) replacement" on page 8-427.
Table 8-372 Preparations and Preparation Links
Preparations - you must perform the following steps