10-10 CIC Pro™ 2026419-033E
Preventive maintenance
NOTE
If the reading is greater than the specification below, and the device under
test is powered from 100-240 V/50-60 Hz, the device under test fails.
Contact GE Technical Support.
11. Set the power switch of the device under test to OFF.
Test completion
1. Disconnect the leakage tester from the power outlet.
2. Disconnect all test equipment from the device.
3. Disconnect the device power cord from the leakage tester.
Check the operation of input devices and displays
1. Check the keyboard. If any keys stick, or are otherwise non-functional, replace
the keyboard.
2. Check the mouse to make sure the cursor follows mouse movements smoothly
and the mouse buttons function properly.
3. Check the display to make sure it meets proper operation requirements. Refer to
the operating instructions packaged with each display to check for (and adjust if
necessary) the following operational requirements:
Proper contrast and color for best viewing in the environment where used.
Proper screen focus.
Correct horizontal and vertical linearity.
Correct horizontal and vertical position.
Perform checkout procedures
If you replaced any part, follow the appropriate instructions as listed for that part.
Check date and time on the network after maintenance of this current device. See
Pre-configuration instructions on page 6-2.
Verify that the Remote Service agent is enabled. See Enable or disable the
Remote Service Agent on page 6-18.
Check the laser printer connectivity. See Check status of installed printers on
page 7-3.
Check the digital writer connectivity. See Check status of installed printers on
page 7-3.
Check operation of the secondary display on page 7-4 (if applicable).
Check the status of installed licenses on page 7-4.
Verify settings with Check Centrals command on page 7-5.
Check operation of audible alarm tones on page 7-7.