5-2 CIC Pro™ 2026419-033E
Installation
Requirements
The CIC Pro center is to be installed by properly trained, qualified personnel. The
installer must complete the following before physically installing the CIC Pro center:
Complete product training on page 5-2.
Complete site survey on page 5-2.
Complete product training
Product training is required prior to installing, configuring, and calibrating the CIC
Pro center.
Complete site survey
CAUTION
Failure to complete a site survey may lead to improper installation
and improper performance of the CIC Pro center.
A site survey with all network design, installation, and testing must be completed and
documented prior to equipment installation. The site survey is completed by
authorized GE personnel.
Service PC
A PC is required for licensing. This can be a desktop or a laptop computer.
Pre-installation checklist
Set up the service PC’s network properties on page 4-8.
Format a USB memory stick on page 5-3.
Procure necessary licenses on page 5-3.
Gather required tools on page 5-4.
Inspect equipment on page 5-4.
Evaluate site on page 5-4.
Environmental limits on page 5-5.
Electromagnetic fields and electrical noise on page 5-5.
Clearance and airflow on page 5-5.
Electrical grounding on page 5-6.
Un-interruptible power supply (UPS) on page 5-7.
Physical specifications. Refer to the CIC Pro Clinical Information System
Technical Specifications Supplement for physical requirements.