EasyManua.ls Logo

GE MP100 Series

GE MP100 Series
314 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
2026419-033E CIC Pro™ 5-19
Turn on the power
1. Turn on the power by pressing the power switch located on the CIC Pro center
and on the displays.
A green power indicator illuminates when the power is turned on. After
approximately 30 seconds, the multi-patient viewer should display.
2. Proceed to Configuration on page 6-1.

Table of Contents

Related product manuals