EasyManua.ls Logo

GE Optima CT680 Series - Page 37

GE Optima CT680 Series
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Chapter 1 - Position Subsystems Page 37
1 – Pos. Subsystems
NOTICE Positioning requires cutting eight (8) holes in the floor covering.
Before you drill or cut any flooring, make sure that you have discussed this issue with the
customer, and that the appropriate hospital personnel have approved the location of the
table/gantry.
Any repositioning must meet all regulatory requirements to be completed.
Check that the floor meets the levelness specification. Follow the escalation procedure if the
floor does not meet the floor specification.
If the floor is not level, the system does not meet the table ISO specification. The distance from
the table cradle to the floor cannot be greater than 1005 mm (40 in.).
8.) Check with the customer for approval of the gantry/table placement.
Figure 1-4 Center Line with Marks
9.) Use a center punch to mark hole centers for each of the eight (8) leveling pad/anchor locations
per Figure 1-4. Before moving on to the next step, see Step 11and its note for an alternative
method.
CAUTION Potential for personal injury.
Use appropriate safety procedures when drilling the floor holes, especially if there is lead
under the floor.
Appropriate PPE is required when working with hazardous materials.
10.) Remove the floor template.
GANTRY
Paper templates
TABLETABLE
Tape
with mark
Tape with
mark
Template
center lines

Table of Contents

Related product manuals