EasyManua.ls Logo

GE Sievers 900 Series - Wiring the Remote Start (Binary Input) Connection; Figure 6 Wiring Diagram for the 4-20 Ma Connection

GE Sievers 900 Series
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2009 71 of 236 DLM 90488-01 Rev. A
Figure 6: Wiring Diagram for the 4-20 mA Connection
Wiring the Remote Start (Binary Input) Connection
The 900 On-Line Analyzer remote start (binary input) connection can be wired in a variety of ways
and is intended to execute a start/stop command to the Analyzer from a remote location, such as a
Process Logic Control System or Center (PLC). Wiring examples are shown in Figure 7 and Figure 8.
Note that binary input must be activated in the Analyzer firmware later. It is important to confirm
the correct signal strength before setting binary input to On, to avoid unexpectedly starting or
stopping analysis. For more information on activating binary input, see “Activating Binary Input” on
page 110.
Pin 12 (-)
Pin 11 (+)
TB3
Internal to 900 On-Line Analyzer
4-20 mA Output
Isolated self power
Voltage compliant to 20 V
Max. Load 600 ohms
No external power required
(-)
(+)
Recorder
or
Rload

Table of Contents

Related product manuals