EasyManua.ls Logo

GE Sievers 900 Series - Reagent and Component Replacement

GE Sievers 900 Series
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2009 175 of 236 DLM 90488-01 Rev. A
Replacing the Chemical Reagents
The oxidizer and acid reagents must be purchased from GE Analytical Instruments to ensure
product purity and operating life. The use of reagents from other sources or failure to replace the
reagents on the prescribed replacement schedule will invalidate the Analyzers warranty.
1. If the Analyzer is taking measurements, press the Stop Analysis button.
2. Turn off power to the Analyzer with the main power switch.
3. Open the Analyzer front panel by turning the two latches and swinging the panel door to
the left.
4. Locate the reagent enclosure, located at the top left-hand side of the Analyzer as you face
the Analyzer. Loosen the set screw and remove the reagent enclosure cover.
5. For each cartridge that you are replacing:
Remove the cartridge from the enclosure.
Push the red button to close the valve.
Loosen the PEEK nut and disconnect the cartridge from the reagent syringe tubing.
Warning
Reagent containers are for single-use only: do not refill. Refilling or reusing
reagent containers will void all Analyzer and parts warranties and nullify any
performance claims.
Warning
To avoid exposure to the chemical reagents, wear acid-resistant gloves, protective
clothing, and safety goggles or a face shield when changing the reagent supplies.
Warning
Acid or oxidizer may spill from the containers if the valves are not closed.
Note: Reagent containers need to be disposed of according to local regulations. All reagent
containers are shipped with Material Safety Data Sheets (MSDS). These sheets will
provide instructions. GE Analytical Instruments can not accept containers for disposal.

Table of Contents

Related product manuals