EasyManua.ls Logo

GEFRAN-SIEI ARTDrive Vector V2 Series - Pre-power Checks; Grounds; Grounding; Connections; Motor Data

GEFRAN-SIEI ARTDrive Vector V2 Series
387 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
78 • Chapter 5 Quick Start Up Guide ARTDrive V2 series - Instruction Manual
of operation and dozens of combinations of configurations, this guide will cover
most applications that are not being started up by a service engineer.
The instruction book can be used to make more complex changes to standard
configuration beyond this set up.
Standard Wiring scheme: see chapter 4, Wiring Procedure.
5.3 Pre-power Checks
The following should be checked before switching the Drive ON :
Grounds / Grounding
- Verify ground connections drive to motor
- Verify AC Inputs, AC Outputs and control wiring are clear of grounds
- Drive power supply may be intentionally grounded
Connections
- Check AC Inputs (U1/L1, V1/L2, W1/L3), AC Outputs (U2/T1, V2/T2, W2/
T3) for tightness and good connections
- DC connection with an optional external Braking Unit (C,D)
- Motor thermistor (78,79)
- “Digital Output 0” Relay (80,82 n.o), “Digital Output 1” Relay (83,85 n.o)
- Regulation Board connections:
1………46 on connectors XS, XE
12 ENABLE Drive (close to active)
13 Digital input 1
16 Common for terminal board
18 + 24V Common
19 + 24VDC (internal)
- Any option board connections
Figure 5.3.1: Terminal connections
12 13 14 15 16 18 19
- Encoder connections (if used)
- Record Motor Name Plate Data, encoder infomation and mechanical data.
Motor Data
Table 5.3.1: Motor Data
HP (kW)
Amps
Volts
Hz
Rpm
Cos phi (power factor)
Tac h t ype
Tac h P PR
Motorrotation for machine fwd direction [CW/CCW]
Gearbox ratio

Table of Contents

Related product manuals