EasyManuals Logo

Getinge 9125 User Manual

Getinge 9125
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #136 background imageLoading...
Page #136 background image
DOSING
Replacing a hose in the dosing pump
This must only be done by authorized personnel.
Before starting work, make sure that the machine is disconnected from the
electric power supply.
Remove the cover (1) by unscrewing the screw (2).
Remove the hoses at the connections (3).
Take out the entire unit including hose (4) (a complete spare parts kit).
Install the new unit.
Refit the cover.
Validate the flow measurement.
Page 136 of 166
<Doc_TEC><Doc_6001341502><Rel.A><Lang_en>

Table of Contents

Other manuals for Getinge 9125

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge 9125 and is the answer not in the manual?

Getinge 9125 Specifications

General IconGeneral
BrandGetinge
Model9125
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals