EasyManua.ls Logo

IBM 300 - Display Installation on Top of 29 U Rack

IBM 300
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
c. Put the display in place (near the front of the machine).
d. Once the display is in place, secure it by tightening the screws «F¬.
3. Route the display power and signal cables through the top opening.
4. Reinstall the top cover «B¬ (see Figure 6-4 on page 6-3). Be sure that the signal
and power display cables are correctly routed in the top aperture «C¬. Secure
the top cover with the screws «A¬ previously removed.
5. At the rear of the Nways Switch administration station, connect the display
signal cable «L¬ (see Figure 6-8 on page 6-7).
D
D
F
Figure 6-7. Display Installation on Top of 29U Rack
6-6 2220 Setup and Service Guide

Table of Contents

Related product manuals