EasyManuals Logo

IBM Storwize V7000 Quick Installation Guide

IBM Storwize V7000
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #104 background imageLoading...
Page #104 background image
3. Power on the control enclosure. Use the supplied power cords to connect both power supply units of
the enclosure to their power sources.
If the power sources have circuit breakers or switches, ensure that they are turned on. The enclosure
does not have power switches.
Notes:
Each enclosure has two power supply units. To provide power failure redundancy, connect the two
power cords to separate power circuits.
Ensure that each power cable is secured to each PSU on the back of the enclosure.
What to do next
Next, you will connect an Ethernet cable to the technician port on the control enclosure, and initialize the
system.
80 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-
U5B

Table of Contents

Other manuals for IBM Storwize V7000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V7000 and is the answer not in the manual?

IBM Storwize V7000 Specifications

General IconGeneral
ModelStorwize V7000
Storage TypeHybrid Flash Array
RAID Levels0, 1, 5, 6, 10
Form Factor2U
Drive TypesSSD, SAS
Host Interface8 Gbps Fibre Channel, 16 Gbps Fibre Channel, 1 Gbps iSCSI, 10 Gbps iSCSI, 12 Gbps SAS
Maximum Cache32GB
Operating System SupportIBM AIX, Linux, Windows, VMware
Data Reduction FeaturesReal-time Compression
Management SoftwareIBM Spectrum Virtualize

Related product manuals