EasyManua.ls Logo

IBM Storwize V7000 - Node canister LEDs

IBM Storwize V7000
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• Adding a control enclosure (either by itself or with one or more expansion enclosures) to an
existing system. You do not need to power off the system. You can add a control enclosure while the
system is operational.
• Setting up a new system that consists of more than one control enclosure. Install the rst control
enclosure and then the required expansion enclosures. For each additional control enclosure, complete
the setup as if you were adding it to an existing system.
Table 4 on page 2 lists the steps for each scenario.
Table 4. Steps for different installation scenarios
New system (control
enclosure only)
New system (control
enclosure and one or
more expansion
enclosures)
Adding expansion
enclosures to an
existing system
Adding control
enclosures and
expansion enclosures
to an existing system
“Reviewing your packing
slip” on page 4
“Reviewing your packing
slip” on page 4
“Reviewing your packing
slip” on page 4
“Reviewing your packing
slip” on page 4
“Identifying the
hardware components”
on page 6
“Identifying the
hardware components”
on page 6
“Identifying the
hardware components”
on page 6
“Identifying the
hardware components”
on page 6
“Verify environmental
requirements” on page
9
“Verify environmental
requirements” on page
9
“Verify environmental
requirements” on page
9
“Verify environmental
requirements” on page
9
Review enclosure
location guidelines
Review enclosure
location guidelines
Review enclosure
location guidelines
Review enclosure
location guidelines
“Installing support rails
for the Storwize V7000
Gen3 control
enclosures ” on page
13
“Installing support
rails for the Storwize
V7000 Gen3 control
enclosures ” on page
13
“Installing support
rails for 2U
expansion
enclosures ” on page
18
“Installing support rails
for 2U expansion
enclosures ” on page
18
1
“Installing the support
rails: 2076-92F ” on
page 26
“Installing support
rails for the Storwize
V7000 Gen3 control
enclosures ” on page
13
“Installing support
rails for 2U
expansion
enclosures ” on page
18
2
“Installing a Storwize
V7000 2076-724/U7B
control enclosure” on
page 15
“Installing a Storwize
V7000 2076-724/U7B
control enclosure” on
page 15
“Installing an optional
5U SAS expansion
enclosure” on page
29
1
“Installing a Storwize
V7000 2076-724/U7B
control enclosure” on
page 15
2
“Installing an optional
2U SAS expansion
enclosure ” on page 22
“Installing an optional
2U SAS expansion
enclosure ” on page 22
“Installing an optional
2U SAS expansion
enclosure ” on page 22
“Connecting optional
expansion enclosures to
the Storwize V7000
Gen3 control
enclosure ” on page 125
“Connecting optional
expansion enclosures to
the Storwize V7000
Gen3 control
enclosure ” on page
125
1
“Connecting optional
expansion enclosures to
the Storwize V7000
Gen3 control
enclosure ” on page
125
1
“Connecting Ethernet
cables to the node
canisters” on page 123
“Connecting Ethernet
cables to the node
canisters” on page 123
“Connecting Ethernet
cables to the node
canisters” on page 123
2
2 Storwize V7000 : Gen3 Quick Installation Guide for MTM 2076-724, 2076-U7B, 2076-12F, 2076-24F, and
2076-92F

Table of Contents

Other manuals for IBM Storwize V7000

Related product manuals