Routine Maintenance
Greasing
129 129
9811-3400-4
Testing the System
In order to test the correct operation of the system, carry
out a single greasing cycle.
1 Turn starter switch to IGN.
2 Press test button D for 3 to 5 seconds.
3 The system will perform a single cycle test.
In order to prime the system after cleaning the machine or
to vent the system; a continuous greasing cycle should be
carried out.
1 Turn starter switch to IGN.
2 Press test button D for more than 6 seconds.
3 The system will perform a continuous cycle run.
Note: The continuous greasing cycle will continue to run
until the starter switch is turned to OFF.
807200-2
Fig 74.