EasyManua.ls Logo

jcb 426 - Page 141

jcb 426
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Routine Maintenance
Greasing
129 129
9811-3400-4
Testing the System
In order to test the correct operation of the system, carry
out a single greasing cycle.
1 Turn starter switch to IGN.
2 Press test button D for 3 to 5 seconds.
3 The system will perform a single cycle test.
In order to prime the system after cleaning the machine or
to vent the system; a continuous greasing cycle should be
carried out.
1 Turn starter switch to IGN.
2 Press test button D for more than 6 seconds.
3 The system will perform a continuous cycle run.
Note: The continuous greasing cycle will continue to run
until the starter switch is turned to OFF.
807200-2
Fig 74.

Table of Contents

Related product manuals