•
Follow the prescribed electrostatic discharge (ESD) prevention procedures to avoid
damaging the equipment. Static discharge can cause components to fail completely
or intermittently over time.
•
Install the device in a secure area, so that only authorized personnel can access the
device.
Related
Documentation
General Safety Warnings for Juniper Networks Devices on page 156•
• General Safety Guidelines for Juniper Networks Devices on page 155
• Installation Safety Warnings for Juniper Networks Devices on page 164
Site Preparation Checklist for ACX1000 and ACX1100 Routers
The checklist in Table 16 on page 45 summarizes the tasks you need to perform when
preparing a site for ACX1000 and ACX1100 router installation.
Table 17: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Environment
“ACX1000 and ACX1100 Router
Environmental Specifications” on
page 48
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Measure the distance between external power
sources and router installation site.
“ACX1000 and ACX1100 Router
Grounding Specifications” on page 57
Locate sites for connection of system
grounding.
“ACX1100 AC Power Specifications”
on page 59
“ACX1000 and ACX1100 DC Power
Specifications” on page 61
Calculate the power consumption and
requirements.
Hardware Configuration
“ACX1000 and ACX1100 Universal
Access Router Overview” on page 3
Choose the number and types of routers you
want to install.
Rack or Cabinet
“Rack Requirements for ACX1000
and ACX1100 Routers” on page 52
“Cabinet Requirements for ACX1000
and ACX1100 Routers” on page 51
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the router.
47Copyright © 2017, Juniper Networks, Inc.
Chapter 5: Preparation Overview