Table 10: Site Preparation Checklist for Services Gateway Installation (continued)
NotesDatePerformed ByAdditional
Information
Item or Task
SRX100 Services
Gateway Site
Electrical Wiring
Guidelines on page
115
SRX100 Services
Gateway Power
Specifications and
Requirements on
page 116
Measure the distance
between the external
power sources and the
device installation site.
Locate sites for connection
of system grounding.
Calculate the power
consumption and
requirements.
Rack Requirement
SRX100 Services
Gateway Rack
Requirements on
page 21
Verify that your rack meets the
minimum requirements.
Rack Installation
Preparing the
SRX100 Services
Gateway for
Rack-Mount
Installation on page
35
Plan the rack location,
including required space
clearances.
Secure the rack to the floor
and building structure.
Cabinet Requirement
SRX100 Services
Gateway Cabinet
Requirements on
page 20
Verify that your cabinet
meets the minimum
requirements.
Plan the cabinet location,
including required space
clearances.
Wall Installation
Preparing the
SRX100 Services
Gateway for
Wall-Mount
Installation on page
37
Verify that the area selected
meets the minimum
requirements.
Verify that you have the
required hardware to
proceed with the
installation.
Desktop Installation
18 Site Preparation Checklist for the SRX100 Services Gateway
SRX100 Services Gateway Hardware Guide

Table of Contents

Other manuals for Juniper SRX100

Related product manuals