Keysight E4981A 120 Hz/1 kHz/1 MHz Capacitance Meter
User Manual
1 Unpacking and Preparation
This chapter describes how to set up and start the Keysight E4981A
Capacitance Meter.
Contents of this Chapter
• “Checking the Shipment” on page 12
After you receive the E4981A, check all the items in the packing
container.
• “Environmental Requirements” on page 13
Describes the system requirements needed to install the E4981A and
how to secure space for heat radiation.
• “How to Remove the Handle” on page 16
Shows how to attach and remove the handle.
• “Preparations Before Use” on page 18
Shows how to check the power supply as well as check and connect
the power cable. This section also describes how to deal with a blown
fuse.
• “Starting the E4981A” on page 20
Describes how to turn on/off the power switch and cut off the power
supply.