EasyManua.ls Logo

Keysight E4981A - 5. Preparation for Accurate Measurement (Executing Correction); Correction Function Overview and Control

Keysight E4981A
259 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Keysight E4981A 120 Hz/1 kHz/1 MHz Capacitance Meter 15
Unpacking and Preparation
Environmental Requirements
Ensuring adequate free space around the capacitance meter for immediate
disconnection of the power cable in case of emergency
As described in “Disconnecting from the supply source” on page 21, the plug
attached to the power cable serves as the disconnecting device (device that
cuts off the power supply) for the E4981A. When installing the E4981A, ensure
that there is sufficient free space around the unit to permit quick disconnection
of the plug (from the AC outlet or the E4981A unit) in case of emergency.

Table of Contents

Other manuals for Keysight E4981A

Related product manuals