EasyManua.ls Logo

Kodak M35 - Adjustment of the Replenishment Pumps

Kodak M35
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Adjustment of the Replenishment Pumps
[1] Remove the TOP COVER and the
RECEIVING BIN.
[2] Loosen the 2 SCREWS and remove the
PUMP COVER.
[3] Actuate the DETECTOR SWITCH, by lifting
the top DETECTOR ROLLER of the
DETECTOR CROSSOVER ASSEMBLY, until
the ADJUSTMENT SCREW is visible through
the hole in the BRACKET.
[4] Loosen the SETSCREW.
Do not adjust the LOCKNUT on the
H112_0115AC
H112_0115ACC
BRACKET
SCREW (2)
PUMP COVER
TOP COVER
other end of the ADJUSTMENT
SCREW.
[5] Rotate the ADJUSTMENT SCREW: [7] Check the flow rates and do steps 2 - 6 again
if necessary. See the table on page 2-41 for
various replenishment rates.
clockwise to increase the flow
[8] Install the TOP COVER, the PUMP COVER,
rate
and the RECEIVING BIN.
counterclockwise to decrease the flow
[9] Check that the REPLENISHMENT PUMPS
rate
operate correctly by feeding a sheet of film
into the processor. See page 2-4.
[6] Tighten the SETSCREW.
H112_0030BC
DECREASE INCREASE
OUTPUT
ADJUSTMENT SCREW
HOLE
BRACKET
REPLENISHMENT PUMP
LOCKNUT
adjust!
Do not
SCREW
ADJUSTMENT
SETSCREW
H112_0030BCB
Adjustment of the Replenishment Pumps
981777 2-37

Table of Contents

Related product manuals