Adjustment of the Replenishment Flow Rates
in M35A Processors with Serial No. 8940 and Below or
in M35 Processors with Serial No. 3760 and Below
[1] Remove the: [8] To adjust the developer flow rate, lift the top
DETECTOR ROLLER to operate the
• 2 CROSSOVER ASSEMBLIES
REPLENISHMENT PUMP for 28 or
• developer and fixer RACK ASSEMBLIES
34 seconds. See the table on page 2-41.
[2] Insert the J-TUBE into the developer TANK.
NOTE
[3] Energize the processor.
The REPLENISHMENT PUMP
[4] Manually actuate the DETECTOR SWITCH by
operates for 34 seconds for each 35 x
lifting the top DETECTOR ROLLER of the
43 cm (14 x 17 inch) sheet of film.
DETECTOR CROSSOVER ASSEMBLY.
[5] Allow the developer to fill the J-TUBE.
[9] Check that the amount of developer in the
GRADUATE is the same as in the table.
[6] Release the DETECTOR ROLLER.
[10] Check the developer flow rate again by doing
[7] Hold a GRADUATE under the J-TUBE.
steps 4 - 9.
[11] Clean the J-TUBE before inserting it into the
fixer TANK.
[12] To adjust the fixer flow rate:
(a) Insert the J-TUBE into the fixer TANK.
(b) Do steps 4 - 9.
H112_0142BA
H112_0142BCA
TANK
J-TUBE
GRADUATE
Adjusting the Replenishment Flow Rates
in M35A Processors with Serial No. 8940 and Below or
in M35 Processors with Serial No. 3760 and Below
2-40 981777