(d) Allow the developer to reach the new, adjusted temperature.
(e) Check the developer temperature in the DEVELOPER TANK with the THERMOMETER.
(f) If the developer temperature is not correct, do steps (c) - (e) again.
(g) Close the ELECTRICAL BOX and install the SIDE PANEL.
[4] Install the TOP COVER.
H112_0087BC
H112_0087BCA
R2
BOARD
100 CIRCUIT
Checking and Adjusting the Developer Temperature
3-14 981777