EasyManua.ls Logo

Maeda CC1485S-1 - Slewing the Machine

Maeda CC1485S-1
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
162
[3] MAKING PIVOT TURN (SPIN TURN) ON THE SPOT
To make a pivot turn to the left, pull the left travelling lever
toward you and push the right travelling lever forward.
NOTES
To make a pivot turn to the right, pull the right travelling lever
toward you and push the left travelling lever forward.
3.10 SLEWING THE MACHINE
The rear end of the machine protrudes from the crawler width. Check for safety in the
vicinity with the rear view camera, mirrors and visual inspection before slewing.
• Check for safety in the vicinity of the machine and honk the horn before starting to slew
the machine.
When the lever is operated with engine speed decreased due to auto decel operation, the
engine speed increases suddenly. Pay due attention when operating the lever.
1. Operate the left work equipment operation lever (1) to slew.
(A): Left slewing
(B): Right slewing

Table of Contents

Other manuals for Maeda CC1485S-1

Related product manuals