3.24.3 OPERATION OF TRAVELLING A HOISTED LOAD WORK
When performing travelling hoist work, see "OPERATION 3.24.1 PRECAUTIONS IN
OPERATION DURING TRAVELLING A HOISTED LOAD " and try to perform safety work.
• Do not perform any crane operation when travelling with a hoisted load. The machine may
overturn.
• When performing travelling hoist work, be sure to sit
on the driver seat and carefully
perform the travelling a hoisted load operation.
• Check the safety in the vicinity of the machine and honk the horn before starting to move
the machine.
• When changing the forward/backward movement of the machine or the direction, check
the safety in the vicinity of the machine and honk the horn before making a change.
• Keep the engine speed low during travelling and slowly and carefully travel.
Keep an extra distance so that the hoisted load or machine does not crash against another
1. When travelling the machine, see "OPERATION 3.8 STARTING (FORWARD AND
BACKWARD)/STOPPING THE MACHINE " and "OPERATION 3.9 CHANGING DIRECTION OF
THE MACHINE".
2. See "OPERATION 3.17 HOISTING AND LOWERING OPERATION " and "OPERATION 3.18
BOOM DERRICKING OPERATION" and perform the crane operation. At this time, keep the
hoisted load height near the ground so that the load does not sway.
When the overload stop function of the moment limiter is activated, see “OPERATIONS 2.4.3 [2]
RECOVERY OPERATION FROM AUTOMATIC STOP”.
3.24.4 CANCEL OPERATION OF TRAVELLING HOIST OPERATION POSTURE
1. See "OPERATION 3.8 STARTING (FORWARD AND BACKWARD)/STOPPING THE MACHINE"
and "OPERATION 3.11 MACHINE PARKING "and park the machine.
2. Press and hold the travelling mode selector switch on the
monitor.
The mode is set to the rest mode and the monitor display
changes.
3. See “OPERATION 3.7 MACHINE TRAVELLING POSTURE”
and put the machine in the "Travelling posture".