10. MAINTENANCE PROCEDURE
10.1 INITIAL 500 HOUR MAINTENANCE
The following maintenance should be performed after 500hours of operation for the 1st
maintenance servicing only, of a new machine.
[1] OIL REPLACEMENT IN WINCH REDUCTION GEAR CASE
See "10.7 MAINTENANCE EVERY 1000 HOURS " for maintenance places and procedure.
10.2 PRE-OPERATION INSPECTION
Inspections described in this section should be conducted before the first engine start-up of the
day.
See ā€œ9. LIST OF ITEMS FOR INSPECTION AND MAINTENANCEā€ for the items of pre-operation
inspection.
See "OPERATION 3.1 PRE-OPERATION INSPECTION" for maintenance places and procedure
of pre-operation inspection.