203
5. Pass the wire rope for slinging through between the 1st and
2nd of the track crawler from the front of the machine and
between the 1st and 2nd from the rear.
6. Put nailing strips between the wire rope and machine so
that the wire rope and machine are not damaged.
7. Set the slinging angle of the wire rope for slinging to 20 - 30
degrees and slowly lift the machine.
Immediately after lifting (dynamic lift off), stop once to check
the sling state and sling posture.