1. PRECAUTIONS OF FLY-JIB OPERATION 304
3. FLY-JIB EACH SECTION 309
4. FLY-JIB INSTALLATION AND STOWAGE 310
4.1 INSTALLATION OF FLY-JIB 311
4.2 CHANGING OF FLY-JIB TILT ANGLE 316
4.3 EXTENDING AND RETRACTING NO.2 FLY-JIB
4.3.1 EXTENDING NO.2 FLY-JIB CONFIGURED 0 DEGREE OR 20 DEGREES
TILT ANGLE
4.3.2 EXTENDING NO.2 FLY-JIB CONFIGURED 40 DEGREES OR 60 DEGREES
TILT ANGLE
322
4.3.3 RETRACTING OF No.2 FLY-JIB 324
4.4 STOWAGE OF FLY-JIB 325
4.5 REMOVAL OF FLY-JIB 330
4.6 INSTALLATION OF FLY-JIB 334
5. HANDLING MONITOR AND MOMENT LIMITER
5.1 NAMES OF MONITOR DISPLAY 342
5.1.1 MONITOR DISPLAY IN FLY-JIB MODE 342
5.1.2 MONITOR DISPLAY WHEN FLY-JIB IS STOWED 344
5.2 MOMENT LIMITER FUNCTIONS 345
5.2.1 DISPLAY FOR FLY-JIB MODE SWITCHING 346
5.3 SETTING OF OPERATING CONDITIONS 347
6. OPERATIONS 348
6.1 CAUTIONS FOR FLY-JIB OPERATION 348
7. TROUBLESHOOTING 349
7.2 WHEN SUCH A PHENOMENON OCCURS 350
8. INSPECTION AND MAINTENANCE 351
8.1 CHECKING BEFORE OPERATION 351
8.2 MAINTENANCE EVERY 50 HOURS 353
9.1 SPECIFICATION TABLE 354
9.2 SPECIFICATION DIMENSIONAL DRAWING 355
9.3 RATED TOTAL LOAD CHART 356
9.4 WORKING RADIUS/LIFTING HEIGHT 357
9.4.1 WORKING RADIUS/LIFTING HEIGHT (WHEN FLY-JIB ANGLE IS 0 DEGREES
AND 20 DEGREES)
9.4.2 WORKING RADIUS/LIFTING HEIGHT (WHEN FLY-JIB ANGLE IS 40 DEGREES
AND 60 DEGREES)