Installation
10/05 AWB8230-1541GB
32
Cable routing
If you are routing power and control cables in parallel, keep a
distance of at least 100 mm between them.
Figure 28: Star-type point to point earthing
e
PE
K1T1 Tn Kn
PE
PE
M1
PE
PE
M
3h
Mn
M
3h
h
Lay the control and signal cables separately from the
mains and motor cables.
Figure 29: Crossover of signal and power cables
Example: DF51
a Power cable: L1, L2, L3 or L and N, PE, U, V, W, L+, DC+, DC–, RB
b Control and signal cables: H, O, OI, L, AM, 1 to 5 and 12, CM2, P24
Relay control cable: K11, K12, K14
f 100
ba