EasyManuals Logo

Nordson VersaBlue VB Series User Manual

Nordson VersaBlue VB Series
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #71 background imageLoading...
Page #71 background image
Heatup phase
Operation
4-5
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
Initial Startup
After the melter has been properly installed, initial startup can take place.
Purging Melter
The melter was subjected to extensive testing prior to shipment. In doing so,
the tank was filled with a special test material. Material residue may still be
present in the melter. To remove the residue, melt and feed several
kilograms of material before starting production.
CAUTION: Do not operate Nordson gear pumps without material. Before
switching on the motor, ensure that the tank is filled.
1. Fill the tank (Refer to Filling Tank).
2. Set the main switch to I/ON. The melter begins to heat up.
Position I/ON = Melter switched on.
Position 0/OFF = Melter switched off.
Padlocks can be used to protect the main switch from being turned on by
unauthorized personnel.
3. Wait until the starting screen appears on the control panel.
NOTE: When the very first startup occurs, password protection is not active
(default).
Fig. 4-4 Starting screen

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson VersaBlue VB Series and is the answer not in the manual?

Nordson VersaBlue VB Series Specifications

General IconGeneral
BrandNordson
ModelVersaBlue VB Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals