Preparation Checklists
Rackmount Considerations Yes No N/A Comment
Can the customer ensure power loads are evenly distributed
across all circuits of a single PDU?
Can the customer provide appropriate power drops for the
PDUs?
Related Information
■
“Installing the Server Into a Rack” on page 39
Safety Checklist
Complete the following checklist to ensure that the safety requirements are met for the data
center in which the server will be installed.
TABLE 17
Safety Checklist
Safety Checklist Considerations Yes No N/A Comment
Is there an emergency power shut off?
Is there a fire protection system in the data center room?
Is the computer room adequately equipped to extinguish a
fire?
Is antistatic flooring installed?
Is the floor below the raised floor free of obstacles and
blockage?
Related Information
■
“Electrical Power Requirements” on page 18
■
Oracle Server X5-2 Safety and Compliance Guide
Auto Service Request Checklist
Complete the following checklist if you are planning to use Auto Service Request with the
server.
Site Planning Checklists 173