Loading the Insert Feeders
1. Placeonepieceofmaterialonthefeederbelts.
InitialLoading
2. Shingleabouta1-inch(25mm)stackofmaterialandplaceitontopofthesinglepiece.
3. Continuethisuntilthestackisjustaboutevenwiththetopofthepackcontrolrampandthenstack
todesiredheight.
StacktheFeeder-do not shingle beyond the point noted in this image
Running the System
Pitney Bowes Epic Select Operator Guide December,2017 Page 179 of 288