5. Reinstall the Drive Roller, see "Drive Roller Replacement" on page107.
6. Reinstall the Take-up Roller, see "Take-up Roller Replacement" on page112.
7. Center and square the running belt onto the Take-up and Drive rollers, tension the belt
to specification and verify the belt tracking, see "Running Belt Tension and Tracking
Adjustment" on page40.
8. Reinstall the hood cover, see "Covers and Panels Replacement" on page54, and
left/right Landing Trim covers, see "Covers and Panels Replacement" on page54.
9. Connect the power cord and switch the ON/OFF circuit breaker ON.
10. Do the Operation Verification tests (see "Operation Verification" on page15) and return
to service.
Experience Series 700 Line Treadmills
121
5 Replacement Procedures
Belt and Deck Replacement Procedure