EasyManua.ls Logo

Putzmeister MP 25 - Page 72

Putzmeister MP 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12. Pull out the connector for the agitator motor on the control cabi‐
net.
Item Designation
1 Sealing pin
2 Toolbox
3 Base frame
4 Reservoir
13. Unlock the reservoir by pulling out the sealing pin (in the toolbox).
14. Pull the reservoir horizontally out of the base frame.
15. Carefully set down the reservoir so that it can neither roll away
nor be damaged.
Transport, setting up and connection
4 — 10

Table of Contents

Related product manuals