EasyManua.ls Logo

Roche Cedex Bio - Page 546

Roche Cedex Bio
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
G-12
Operator’s Manual · Version 3.4
Index Cedex Bio analyzer
bottles
cleaner, A–52
external cleaner, B–20
external fluid containers, B–17
external waste container, B–19
external water container, B–18, B–94
ISE fluids, F–11
reagents, A–53
reagents, specifications, A–66
replacing ISE, F–24, F–33
bottom detection, A–49
buttons
global action, A–71
overview, A–128
C
calculation, B–165
ratios, B–165
calibration
checking if due, B–34
checks, C–21
definitions, B–163, B–179
deleting orders, B–70
deleting results, B–103
during Prepare phase, B–33
expnential 5, C–21
forecast period, A–30
–introduction, A28
ISE, F–12, F–28
linear interpolation, C–17
linear regression, C–18
logit/log 4, C–19
logit/log 5, C–20
main ISE calibration, F–12
–overview, A28
performing, B–65
–quantitative, C17
reserve, A–31
schedule, B–104
selecting tests, B–68
short guide, B–66
validating results, B–70, B–71
calibration list, screen, A–107
calibration results
auto accept, B–70
obsolete, A–30
calibrator lot, defining, B–112
calibrators
placing, B–35, B–69
specifications, A–66
certificates, importing, B–125
changing
configuration values, B–146
low voltage fuses, E–49
mains fuses, E–47
orders, B–46
password, B–167
user definitions, B–169
characters, special, A–77
checking
alarm messages, B–54
analyzer status, B–52
bottle sets, B–25, B–108
cleanerbottle, B–20
external fluid containers, B–17
–ISE status, F23
printer status, E–46
sample status, B–49
wastecontainer, B–19
watercontainer, B–18, B–94
classification of safety notices, A–5
Clean and disinfect housing, maintenance action, D–20
Clean ISE tower automatically, maintenance
action, F–54
Clean ISE tower manually, maintenance action, F–55
Clean probe manually, maintenance action, D–12
Clean reagent disk and sample area, maintenance
action, D–14
Clean rotor and heating channel, maintenance
action, D–10
Clean the water and waste containers, maintenance
action, D–16
cleaner
checking external bottle, B–20
replacing bottle, B–20
cleaner bottle, A–52
cleaning
ISE tower off the analyzer, F–40
ISE tower on the analyzer, F–55
waste container, D–17
water container, D–16
cleaning up
database, D–21
–results, B92
Cleanup database, maintenance action, D–21
clearing paper jam, E–46
collapsing lists, A–74

Table of Contents

Related product manuals