EasyManua.ls Logo

Roche Cedex Bio - Page 547

Roche Cedex Bio
558 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operator’s Manual · Version 3.4 G-13
Cedex Bio analyzer Index
colors
–alarm button, B–54
– analyzer buttons, B–53
– cleaner button, B–20
– concept, A–69, A–72
– cuvette buttons, B–31
– ISE bottle buttons, F–34
– ISE LED, F–10
– LEDs, A–126
– maintenance actions, B–22
– reagent buttons, B–27
– sample buttons, B–49
– test buttons, B–34
– waste button, B–19
–water button, B–18
components
–analyzer, A–43
– disposal, A–11
– ISE unit, F–10
concentration, ISE results, C–35
concepts
–calibration, A–28
– colors in screens, A–69, A–72
– wizards, A–69
condensation, removing from the reagent cooler, B–134
Condition ISE tubing, maintenance action, F–50
configuration, B–143, B–167
– Abs. adjustment, B–181
– calibration definitions, B–179
– changing values, B–146
–date and time, B–181
– extra wash definitions, B–182, B–183, B–184, B–185
– host definitions, B–177
– maintenance days, B–181
– QC definitions, B–179
– result handling, B–179
– screen, A–113
– system definitions, B–180
– viewing values, B–145
– workflow definitions, B–176
confirming, alarm messages, E–9
connecting
– external cleaner bottle, B–138
– external waste container, B–138
– external water container, B–137
connectivity, host, A–33
connectors
–fluids, A–47
–overview, A–63
contact addresses, 3
Contact service representative, maintenance
action, D–25
containers
– fluids, A–50
– reagent disks, A–58
–waste, A–50
–water, A–51
control lot, defining, B–110
controls
– definitions, B–164
– placing, B–76
conventions used in manual, 8
cooling, reagents, A–58
copyrights, 2
correlations, B–166
covers
–ISE, F–9
– overview, A–39
cross-contamination, A–9
csv files, B–91
cups, A–53
cuvette blank correction, C–6
cuvette ring, A–59
cuvette status, screen, A–95
cuvettes, A–54
– checking the status, B–31
– handling, A–55
– replacing, B–31, B–93
– ring, A–59
– segments, A–55
– specifications, A–66
D
daily backup, B–90
daily operation, B–3
– introduction, A–22
– overview table, A–22
Daily prepare actions, maintenance action, F–48
data analysis, C–3
data security, A–10
database
– cleaning up, D–21
– exporting, B–113
– importing, B–123
– restoring, B–123
date and time, definitions, B–181
deactivating ISE unit, F–68
Default QC
– overview, B–74
– performing, B–76

Table of Contents