Maintenance
Shipping
312 MagneMotion
Rockwell Automation Publication MMI-UM007F-EN-P - September 2020
1. Turn off and disconnect all power and communication connections as detailed in
Shut-down on page 261.
2. Make sure that the component has been properly decontaminated following the decon-
tamination procedures for the facility. Follow all facility, local, and national proce-
dures for the disposal of any hazardous materials.
3. When shipping individual components, remove all components to be shipped (see
Transport System Installation on page 179 and reverse the sequence to remove the
components) and see Shipping Components on page 312.
Shipping Components
1. Each component must be wrapped, bagged, and packed following standard packing
procedures.
2. Using the container that the component was originally shipped in, set the component
into the container and secure using the supplied packing material.
3. Close the shipping container and secure.
4. Make sure that the container is properly labeled (This End Up, Caution – Heavy, and
so on) and all shipping documents are attached to the outside of the container.
5. When shipping to MagneMotion, make sure that the RMA number is clearly visible on
the outside of the container.
LIFTING HAZARD: The QuickStick HT motors can
weigh as much as 41.5 kg [91.5 lb]. Failure to take the proper
precautions before moving them could result in personal
injury.
Use proper techniques for lifting and safety toe shoes when
moving any QuickStick HT components.
MAGNETIC FIELD HAZARD: When shipping magnet
arrays, make sure that the shipping container properly iso-
lates the magnet arrays or identifies the Magnetic Field Haz-
ard.